Skip to main content
Fig. 5 | BMC Genomics

Fig. 5

From: On the utility of RNA sample pooling to optimize cost and statistical power in RNA sequencing experiments

Fig. 5

Simulation results. Results of the simulation based evaluation: The curves show the trade-off between the true positive rate (TPR) and the actual FDR evaluated at 0-40% nominal FDR level. The solid circles on each curve indicate the TPR and actual FDR at 5% nominal FDR (indicated by the vertical dashed line). The DE genes in the simulated dataset have |LFC|≥0.5a or |LFC|≥1b

Back to article page